Contracting Authority

DCNS

Contractual period

3 phases of 2 months

Key words

Floating Dock – Tahiti

Nature of works:

Asbestos removal and conventional paint treatment

Mission:

Ultra high pressure (3800 bars) asbestos removal work on the two ballast tanks of the French Navy’s floating dock

Specificity:

Export site