Contracting Authority

Région IDF

Project manager

SAMEX Sécurité

Contractual period

7 months

Key words

Louis Armand High School – Paris

Nature of works:

Asbestos removal and cleaning work at the Louis Armand Science and Digital High School, in the 15th arrondissement of Paris

Missions:

The work is being carried out as part of the rehabilitation of the A / B / C buildings of the Lycée Louis Armand in Paris 15th.

– Red cleaning in a confined area.

– Cleaning of contaminated ceilings (11,000m2).

– Interior plaster: 10,000m2
(banners on the interior partitions and droplet plaster on concrete)

– Deflocking 10,000m2 ceiling and HP finishing (on concrete block and metal beam)

– Floor sanding: 7000m2

Specificity:

– Dense urban environment

– 300,000m3 of air renewal in a single zone.

– Blue flocking (crocidolite)

– Very large quantity of waste 1600 Big bags in 3 months of zone (26 big bags produced per day)