Contracting Authority

O-I France SAS

Project manager

Chovet DB2i

Contractual period:

3 months

Key Words:

OI Manufacturing – Veauche (glasswork)

Nature of works:

Asbestos removal and lead removal from glassworks

Missions:

Sandblasting of asbestos paint on the furnace frame

Full height thermo-welded containment.

Industrial lead-plating

Removal of refractory bricks polluted with lead

Specificity:

Work at height