Contracting Authority

SNCF mobilité

Contractual period

10 months

Key words

SNCF Mezidon

Nature of works:

Asbestos removal from a coral train composed of two drive cars and 8 trailers.

Cleaning, demolition and recovery of metals

Missions:

  • MPCA Surface to Treat per Trailer
    type car (8 units):
    • 320m² INSONASTIC
    • 320m² of glass wool bonded to the plaster
    • 1 set of compression seal, braid seal, spark arrester plate
  • MPCA area to be treated per motor car (2 units):
    • 375m² INSONASTIC
    • 375m² of glass wool bonded to the plaster
    • 1 set of compression seal, braid seal, spark arrester plate

Specificity:

Test site